Product Categories

Injector Ford 1999-2003 7.3L DI Code AE Long Lead (Each) BOSTECH
Part # BOSDE505

245.00 USD
Requires 150.00 Refundable Core Deposit
Add to Cart
Availability: In Stock
  • Stock exchange replacement Bostech injector

Warranty

Parts
  • Refer to Manufacturer's Warranty

Note